Available downloads
- A1 - Application Forms (including Ownership Certificates), dated 25th June 2020 PDF, 437.71 KB
- A2 - Covering Letter, prepared by Robert Hitchins Ltd, dated 25th June 2020. PDF, 78.62 KB
- A3 - Planning Statement (including Draft Heads of Terms and Affordable Housing Statement), prepared by Pegasus Group, dated May 2020 PDF, 9.48 MB
- A4 - Design and Access Statement, prepared by MHP, dated June 2020. PDF, 8.94 MB
- A5 - Report of Community Engagement, prepared by Pegasus Group, dated November 2019. PDF, 7.55 MB
- A6 - A - Transport Assessment, prepared by PFA Consulting, dated March 2020. PDF, 7.21 MB
- A6 - B - Transport Assessment Addendum, prepared by PFA Consulting, dated November 2020. PDF, 16.29 MB
- A7 - A - Travel Plan, prepared by PFA Consulting, dated March 2020. PDF, 8 MB
- A7 - B - Travel Plan - Residential Travel Plan – Updated, prepared by PFA Consulting, dated October 2020. PDF, 8.01 MB
- A8 - Cheltenham Sustainability Checklist. PDF, 287.94 KB
- A9 - Utility Statement, prepared by RHL, Reference: 333.US.01, dated March 2020. PDF, 93.84 KB
- A10 - Waste Minimisation Statement, prepared by Pegasus Group, March 2020. PDF, 421.84 KB
- A11 - Appendix 3 – Habitats Regulation Assessment – Cotswold Beechwoods SPA. Briefing Note: Additional Information for Habitats Regulation Assessment – Cotswold Beechwoods Special Area of Conservation, prepared by Ecology Solutions, dated December 2019. PDF, 1.43 MB
- A12 - File Note Dealing with Further Highway Response from GCC Dated 10th February 2021, prepared by PFA Consulting dated, 5th March 2021. PDF, 1.42 MB
- A13 - Landscape and Visual Consultation Response, prepared by MHP, undated, received by the LPA on 4th February 2021. PDF, 60.65 KB
- A14 - Arboricultural Impact Assessment – Further Information, prepared by MHP, dated September 2020. PDF, 1.89 MB
- A15 - Construction Environmental Management Plan, prepared by Ecology Solutions, dated March 2021. PDF, 1.66 MB
- A16 - Briefing Note: DEFRA Biodiversity Metrics, prepared by Ecology Solutions, dated March 2021. PDF, 1.66 MB
- A17 - Landscape and Ecology Management Plan, prepared by Ecology Solutions, dated March 2021. PDF, 15.7 MB
- A18 - Verified Views and Methodology, prepared by Andy Maw Design, dated January 2021 Part 1 PDF, 11.58 MB
- A18 - Verified Views and Methodology, prepared by Andy Maw Design, dated January 2021 Part 2 PDF, 14.17 MB
- A18 - Verified Views and Methodology, prepared by Andy Maw Design, dated January 2021 Part 3 PDF, 10.49 MB
- A19 - Renewable Energy and Sustainable Construction Statement, prepared by Pegasus Group, dated July 2020. PDF, 196.87 KB
- A20 - Educational Needs Assessment, prepared by Pegasus Group, dated 8th September 2020. PDF, 291.78 KB
- A21 - A - Response to GCC comments (23rd December 2020) PDF, 305.72 KB
- A21 - B - Headline Findings of the Pupil Product Ratio Survey (Pegasus December 2020) which was referred to in the response. PDF, 153.64 KB
- A22 - Location Plan, drawing number: 333.P.1, Rev D, prepared by Robert Hitchins, dated 26th June 2018. PDF, 1 MB
- A23 - Illustrative Masterplan, drawing number: 333.P.3.9, Rev E, prepared by Robert Hitchins, dated 1st August 2018. PDF, 5.19 MB
- A24 - A - Preliminary Access Arrangements, drawing number: H628/02, Rev B, prepared by PFA Consulting, dated 26th February 2020. PDF, 774.13 KB
- A24 - B - Preliminary Access Arrangements, drawing number: H628/02, Rev D, prepared by PFA Consulting, dated 21st November 2020. PDF, 1.02 MB
- A25 - Land Use Parameter Plan, drawing number: P18-0847_02 Sheet No. 2, Rev D, prepared by Pegasus Group, dated 3rd March 2020. PDF, 1.48 MB
- A26 - Access and Movement Parameter Plan, drawing number: P18-0847_02 Sheet No.3, Rev F, dated 3rd March 2020. PDF, 1.3 MB
- A27 - Building Heights Parameter Plan, drawing number: P18-0847_02 Sheet No.4, Rev C, prepared by Pegasus Group, dated 3rd March 2020. PDF, 1.47 MB
- A28 - Green infrastructure Parameter Plan, drawing number: P18-0847_02 Sheet No.5, Rev D, prepared by Pegasus Group, dated 3rd March 2020. PDF, 1.48 MB
- A29 - Landscape Strategy, prepared by MHP, Drawing Number 18017.201, dated 28th April 2020. PDF, 2.91 MB
- A30 - Topographic Survey (1-3), prepared by Nigel Ruxton Land Surveys, References 18169/01, 18169/02A and 18169/03A, dated November 2018. Part 1 PDF, 1.83 MB
- A30 - Topographic Survey (1-3), prepared by Nigel Ruxton Land Surveys, References 18169/01, 18169/02A and 18169/03A, dated November 2018. Part 2 PDF, 4.48 MB
- A30 - Topographic Survey (1-3), prepared by Nigel Ruxton Land Surveys, References 18169/01, 18169/02A and 18169/03A, dated November 2018. Part 3 PDF, 3 MB
- A31 - Layout Section A-A, drawing number: 333.P.4.A, prepared by Robert Hitchins, dated 26th February 2021. PDF, 368 KB
- A32 - Layout Sections B-B, drawing number: 333.P.4.B, prepared by Robert Hitchins, dated 26th February 2021. PDF, 357.88 KB
- A33 - Layout Sections C-C, drawing number: 333.P.4.C, prepared by Robert Hitchins, dated 26th February 2021. PDF, 303.98 KB
- A34 - Indicative Access Long Sections, drawing number: 333.E.7, prepared by Robert Hitchins, dated 15th July 202. PDF, 632.37 KB
- A35 - Non-Technical Summary, dated March 2020. PDF, 8.61 MB
- A36 - A - Volume 1 Main Text, dated January 2020. PDF, 3.89 MB
- A36 - B - ES Fig 1.1 Site Location PDF, 5.81 MB
- A36 - C - ES Fig 1.2 App Site Boundary PDF, 1.51 MB
- A36 - D - ES Fig 2.1 Cumulative Sites PDF, 1.71 MB
- A36 - E - ES Fig 3.1 Land Use Plan PDF, 1.48 MB
- A36 - F - ES Fig 3.2 Building Heights Plan PDF, 1.47 MB
- A36 - G - ES Fig 3.3 Green Infrastructure Plan PDF, 1.48 MB
- A36 - H- ES Fig 3.4 Access and Movement Plan PDF, 1.3 MB
- A36 - I - ES Fig 4.1 Illustrative Masterplan Rev E PDF, 5.23 MB
- A36 - J - ES Fig 7.1 - 7.9 PDF, 4.4 MB
- A36 - K - ES Fig 7.10 - 7.14 PDF, 3.17 MB
- A36 - L - ES Fig 8.1 Cultural Heritage Assets PDF, 293.98 KB
- A36 - M - ES Fig 9.1 PDF, 517.01 KB
- A36 - N - ES Fig 9.2 PDF, 516.29 KB
- A36 - O - ES Fig 9.3 PDF, 519.42 KB
- A36 - P - ES Fig 9.4 PDF, 518.81 KB
- A36 - Q - ES Fig 10.1 PDF, 645.34 KB
- A36 - R - ES Fig 10.2 PDF, 1022.89 KB
- A36 - S - ES Fig 10.3 PDF, 1.55 MB
- A36 - T - ES Fig 10.4 PDF, 1.7 MB
- A37 - A - Appendix 2.1 Request for EIA Scoping Opinion PDF, 1.49 MB
- A37 - B - Appendix 2.2 Scoping Opinion PDF, 202.82 KB
- A37 - C - Appendix 3.1 Agricultural Land Classification and Soil Resources PDF, 4.92 MB
- A37 - D - Appendix 6.1 Site Location, Context and Viewpoint Locations PDF, 5.47 MB
- A37 - E - Appendix 6.2 Arboricultural Survey and Statement PDF, 1.75 MB
- A37 - F - Appendix 7.1 – 7.5 (Information obtained from MAGIC; Weather Conditions During Bat Surveys 2019; Habitats Regulation Assessment; Suitable Examples of Bat Boxes; and, Suitable Examples of Bird Boxes). PDF, 4.06 MB
- A37 - G - Appendix 8.1 Built Heritage Statement PDF, 2.82 MB
- A37 - H - Appendix 8.2 Archaeological Desk Based Assessment PDF, 4.9 MB
- A37 - I - Appendix 8.3 Geophysical Survey Report PDF, 5.27 MB
- A37 - J - Appendix 8.4 Archaeological Evaluation PDF, 2.45 MB
- A37 - K - Appendix 9.1 Transport Assessment PDF, 6.53 MB
- A37 - K - APPENDIX 9.1 TA PART 2 PDF, 6.73 MB
- A37 - L - Appendix 9.2 Travel Plan PDF, 8 MB
- A37 - M - Appendix 10.1 Construction Dust Assessment Procedure PDF, 231.68 KB
- A37 - N - Appendix 10.2 Modelling Methodology PDF, 270.6 KB
- A37 - O - Appendix 10.3 EPUK & IAQM Planning for Air Quality Guidance PDF, 245.53 KB
- A37 - P - Appendix 10.4 Professional Experience PDF, 149.24 KB
- A37 - Q - Appendix 10.5 Construction Mitigation PDF, 209.44 KB
- A37 - R - Appendix 11.1 Noise and Vibration PDF, 779.55 KB
- A37 - S - Appendix 12.1 Flood Risk Assessment PDF, 5.69 MB
- A37 - S - Appendix 12.1 FRA Part2 PDF, 4.63 MB
- A37 - T - Appendix 13.1 Geo-Environmental Desk Study Report PDF, 5.91 MB
- A37 - U - Appendix 13.2 Phase 2 Ground Investigations Report PDF, 5.47 MB
- A38 - Officer Report PDF, 1.06 MB
- A39 - Supplementary Environmental Information (SEI) to the Environmental Statement (requested by PINS), prepared by Pegasus Group, dated August 2021. PDF, 4.82 MB
- A40 - Public Notice Part 1 PDF, 527.13 KB
- A40 - Public Notice Part 2 PDF, 288.47 KB